Solar EPC · Homes & Businesses · Coimbatore · Since 2015

Cut your power bill by up to 90% at home, 40% at the factory

Dynamic Fusion designs, builds and maintains turnkey solar plants across Tamil Nadu - from a single house roof to a full factory shed. Subsidy paperwork, TANGEDCO liaisoning and the panel cleaning years later, all inside one contract. One accountable team.

Solar for homes → Solar for business →

No obligation. Survey report within 7 working days.

Scroll
0MW
Rooftop capacity installed
0+
Solar water pumps commissioned
0Lakh L
Solar water heating installed
0+
Industrial & commercial clients
0
People on the team
About us

Solar EPC, built and run in Coimbatore

Founded in 2015, Dynamic Fusion Private Limited is a fully integrated clean energy company - we develop, build and hold solar assets for the long term. We work at both ends of the scale: the roof of a house, and the roof of a factory.

From our base in Coimbatore we have installed 7.8 MW of rooftop capacity for more than 20 satisfied industrial and commercial customers, commissioned 500 solar water pumps, and put in 6 lakh litres of solar water heating. A team of 35 handles every stage in-house: feasibility and design, procurement, civil and electrical works, CEIG and TANGEDCO liaisoning, commissioning, and the operations and maintenance that follow.

A home rooftop gets the same engineering and the same paperwork discipline as an industrial plant - it is simply smaller. For a homeowner that means one site visit, one written quote, net metering arranged with TANGEDCO, the rooftop subsidy application filed on your behalf, and a team that still picks up the phone years after the panels went up.

Dynamic Fusion technician carrying a solar panel on site
Founded
2015
Headquarters
324 D, Kadampadi Road, Sulur, Coimbatore - 641 401
What we do
Turnkey solar EPC - home and industrial rooftops, ground-mount plants, solar water pumping, solar water heating, and long-term O&M
Team
35 people across legal & regulatory, project management and asset management
For homes
Rooftop systems for houses, villas and apartments, with net metering and the rooftop subsidy application handled for you
For industry
Rooftop and ground-mount plants for factories and commercial facilities, plus agricultural pumping
Service area
Coimbatore, Tiruppur, Erode, Salem, Karur and the rest of Tamil Nadu
Liaisoning
TANGEDCO, CEIG and subsidy paperwork handled in-house, including fees and charges
Industrial plant drawing power from the grid
Today Renting power. Every year, at a price you don't set.
Solar array generating power at sunset
After Owning it. Paid once, generating for 25 years.
Why now

The cost of doing nothing

Power tariffs don't go down. Every year you defer, you pay the grid a bill you could have paid yourself - once - and then stopped paying.

A rooftop solar plant is not an environmental gesture. It is an asset with a defined payback and a 30-year output warranty, and it gets more valuable every time the tariff revises upward. On a factory that shows up on the balance sheet. On a house it shows up as a bill that stops arriving.

The roof is already there. It's already absorbing the sun. The only question is whether it's earning.

Rising tariffs

Power costs have climbed steadily across Tamil Nadu, for factories and households alike. Solar fixes your generation cost on day one and holds it there for 30 years.

An idle asset

Most roofs are structurally ready for solar today, whether it's a factory shed or a house terrace. No new land, no new leases, nothing to build.

Subsidy for homes

Residential rooftop systems qualify for a central government subsidy under the PM Surya Ghar scheme, credited after commissioning. We file the application for you.

Depreciation for business

Commercial and industrial solar assets qualify for accelerated depreciation under Indian law. Confirm the current rate with your CA - it materially shortens payback.

Savings calculator

What would solar save you?

Pick your connection type, then move the slider to your monthly electricity bill. We'll estimate your system size, investment, payback period and 25-year savings - with the residential subsidy already deducted if you're a home. Takes 20 seconds.

Your consumption

₹3,000 per month
Billed every two months? Enter half of it.
Pick this first - it retunes the slider and the subsidy.
Optional, in square feet, about 90 sq ft/kW. Leave blank and we'll size to your load.
₹0  
0 kW  
₹0 Turnkey, all inclusive
- Then it's free power
₹0 After investment and upkeep

Cumulative savings vs investment

Savings Investment

CO₂ avoided: 0 t per year

Want the detailed report? Enter your number and we'll send a full site-specific proposal - plant layout, generation estimate, cash flow and subsidy eligibility.

We call once. If it's not the right time, we don't call again.

Estimates are indicative only, based on typical irradiance and tariff assumptions for Tamil Nadu. Actual output and savings depend on your roof, shading, load profile and applicable tariffs. Domestic figures assume the current residential rooftop subsidy and net metering, both subject to eligibility, scheme rules and TANGEDCO approval - we confirm what you actually qualify for during the survey. Final figures are confirmed only after a physical site survey.

What we do

One partner, start to finish

Technician installing solar panels on a roof

Turnkey EPC

We take the roof - or the land - and hand back a commissioned, grid-connected plant. Design, engineering, supply, installation and testing. On a house that means structure, wiring, inverter, net meter and the subsidy paperwork. On an industrial site, add land levelling, civil and mechanical works, fencing, CCTV, SCADA and EB liaisoning.

If it's between you and generating power, it's in our scope.

Engineer inspecting and cleaning a solar array

Operations & maintenance

Commissioning is the beginning, not the finish line. Scheduled panel cleaning, continuous monitoring, warranty and damage claims, replacement handling and manpower support - with an admin panel so you can check KPIs yourself, any day. Four panels on a terrace or a full industrial roof, the question is the same: is it still generating what it should?

A plant that isn't cleaned loses output silently. We don't let that happen.

Solar cabling and mounting components being fitted

Dynamic Fusion Assured

Our own line of solar balance-of-system components: AC and DC distribution boxes, mounting structures, cables and accessories - specified to world-class standards, because we're the ones who have to stand behind the plant afterwards. Fewer names in the supply chain also means fewer people to chase when a part needs replacing, on a house or on a factory.

We use them on our own projects. That's the only endorsement that means anything.

Who it's for

The same team, two very different jobs

For your home

Houses, villas and apartments

A house doesn't need a project manager and a SCADA system. It needs the right size system, honestly quoted, put up properly and signed off with the board - and someone who deals with the paperwork so you don't have to.

  • 1 to 15 kW, sized to your actual bill after a shadow study of your roof
  • The residential subsidy application prepared and filed on your behalf
  • TANGEDCO net metering arranged end to end, meter to approval
  • Typical payback of 3 to 6 years - after that the power is free
  • The install itself takes days. It's the approvals that take time, and those are ours to chase, not yours
Estimate my home savings
For your business

Factories and commercial facilities

A plant is a capital project, and it gets treated like one: a survey, a load study, a written scope, a build programme and a maintenance contract that outlives the people who signed it.

  • Rooftop and ground-mount plants, HT or LT connection
  • CEIG and TANGEDCO liaisoning in-house, including fees and charges
  • Land levelling, civil and mechanical works, fencing, CCTV and SCADA in scope
  • Accelerated depreciation applies - confirm the current rate with your CA
  • Long-term O&M with admin-panel access to your own generation data
Estimate my plant savings
Scope of supply

Everything included. Nothing to chase.

Ask a solar contractor what's not in the quote - that's usually where the surprises live. Here's our complete scope, in writing, before you sign anything. Everything below is included as standard - the last few lines only apply to one kind of site, and they're marked.

No line items added later. No "that wasn't in the scope."

  • Design, engineering, supply, installation, testing and commissioning
  • Mounting structure engineered for the roof and its wind loading
  • Earthing system
  • Lightning arrestor
  • AC and DC cabling - inverter through to the distribution board or LT panel
  • TANGEDCO liaisoning and net metering - service, fees, charges and metering charges
  • Training on how to check your output and maintain the system
  • Residential subsidy application prepared and filed on your behalf Homes
  • CEIG approval and liaisoning Industry
  • Walkway, safety rails and ladder Industry
  • UPVC pipe lines for panel cleaning Industry
  • Pressure pump Industry
How it runs

From first visit to first unit

1

Site survey & feasibility Free

We visit, measure, assess structural load and shading, and study your consumption pattern. If solar doesn't make financial sense for your site, we tell you that.

2

Proposal & design

Layout, generation model, financial case, payback period. If you're a home, the subsidy you actually qualify for is inside those numbers, not a footnote under them. You get numbers, not adjectives.

3

Agreement & liaisoning

We handle the paperwork. TANGEDCO approvals and net metering on every job, the residential subsidy application if you're a home, CEIG clearance if you're a plant.

4

Supply & civil works

Structures, panels, inverters, cabling. On an industrial site, add land levelling, fencing and borewell where the project calls for it.

5

Installation & commissioning

Mechanical, electrical, testing, energisation. Nobody leaves site until whoever looks after it knows how to read the output and clean the panels - your maintenance staff on a plant, you on a house.

6

O&M handover

Monitoring goes live. The cleaning schedule begins. You start reading the meter in the other direction.

Typical timeline: 30 days (4 weeks) for a 100 kW industrial rooftop. A home system is far quicker to build - on a house it's the approvals that set the pace, not the installation. Subsidy money is credited after commissioning and runs on the government's clock, not ours.

Why Dynamic Fusion

Ten reasons, each with a reason attached

Cost savings that compound

Fix your generation cost once, then watch the grid tariff climb around it.

Proven service record

7.8 MW installed, 500+ pumps, 60+ industrial clients - every year since 2015.

End-to-end solutions

Roof or land, right through to long-term monitoring. One contract, one accountable party.

Qualified technicians

An in-house team of 35 - not a rotating cast of subcontractors you never meet twice.

Quick service resolution

Coimbatore-based. When something needs attention, we're hours away, not states away.

Reduced carbon footprint

Measurable and reportable - increasingly demanded of industrial buyers, and worth having on any roof.

Low maintenance burden

Cleaning, monitoring and warranty claims all sit with us - not with your plant manager, and not with you on a Sunday morning.

Save up to 90% on electricity

Up to 90% on a home rooftop with net metering, around 40% on a well-sized industrial plant. Run the calculator for your number.

A matured industry

Solar is the default now, not the experiment. Suppliers, financing and expertise have all caught up.

Clean, renewable power

Generated on your roof, consumed in your building, with nothing burned in between.

Expertise

Three teams behind every system

The same three teams stand behind a 3 kW roof on a house and a full industrial plant. That's the difference between a company and a crew with a ladder.

Contract being signed at a desk

Legal & regulatory

Mitigates risk across our investments, and keeps a network inside and outside the industry to track and shape renewable energy policy. In practice: your net metering application and your subsidy claim are handled by people who read these rules for a living, not once a year.

Site engineers reviewing project drawings

Project management

Sets the standard for all engineering, procurement and construction, on the strength of long-term partnerships with top-tier equipment suppliers. The panels going on a house are bought on the same terms as the panels going on a factory - a small job doesn't get small-job components.

Plant performance dashboard on screen

Asset management

Optimises performance across every asset - operational data, maintenance checks, warranty claims, insurance and reporting. If your generation starts slipping, this is the team that sees it in the data before you see it on your bill, and it's their job to put it right.

Track record

What we have built since 2015

Four lines of work, one accountable team - every system designed, installed and maintained by Dynamic Fusion.

Rows of solar panels on an industrial rooftop 7.8 MW
Rooftop power plants

Industrial & commercial rooftops

Turnkey rooftop plants for manufacturing facilities - design and engineering through to testing, commissioning and staff training.

7.8 MW Total capacity installed
60+ Satisfied customers
Rooftop solar array on a home at first light 1 - 15 kW
Home rooftop solar

Houses, villas & apartments

Rooftop systems for homes across Coimbatore and Tamil Nadu - sized to your bill, with net metering and the residential subsidy application handled end to end.

1 - 15 kW Typical home system
₹78,000 Max subsidy, handled for you
Solar-powered water pumping station in a field 500 Nos.
Solar water pumping

Agricultural & industrial pumps

Solar pump sets sized, supplied and commissioned across Tamil Nadu - borewell works, structures and cabling included.

500 Pumps commissioned
Zero Running fuel cost
Solar water heating collectors on a rooftop 6 Lakh L
Solar water heating

Process & facility hot water

Solar water heaters installed for industrial process heat and facility use, cutting the electrical and thermal load on the grid.

6 Lakh L Heating capacity installed
Since 2015 Year on year

Figures are cumulative across all Dynamic Fusion installations to date; home rooftop figures are per system, not totals. Named client case studies are available on request.

Roughly 80-100 sq ft per kW for standard modules. A 3 kW home system needs about 250-300 sq ft of shadow-free roof; a 100 kW industrial plant needs about 8,000-10,000 sq ft. We confirm the exact figure during the survey, once we have mapped the shading through the day.

For a home rooftop in Tamil Nadu, typically 3 to 6 years once the subsidy is accounted for. For an industrial rooftop, around 4 to 5 years. It depends on your tariff, your consumption pattern, and how much of the generation you use yourself rather than export. Run the calculator above for an indicative figure on your own bill.

Output drops on overcast days but doesn't stop - panels run on daylight, not direct heat. Annual generation models already account for monsoon months, so the payback figure you're given is a full-year number, not a sunny-day one.

Homes qualify for the central PM Surya Ghar rooftop subsidy: currently ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, capped at ₹78,000 however large the system. Commercial and industrial connections do not qualify, though they can claim accelerated depreciation instead. We prepare and file the residential application for you, and the money is credited after commissioning rather than deducted from what you pay us.

It goes back to the grid, and TANGEDCO credits it against your next bill under net metering. That is why a home system can be sized close to your full consumption - the midday surplus isn't wasted, it offsets the evening draw. We arrange the net metering as part of the job.

No battery is needed for a standard grid-connected system, and most homes don't fit one - it is the single biggest cost you can avoid. The trade-off is worth stating plainly: without a battery the system shuts down during a grid outage, because feeding power into dead lines would put linemen at risk. If you want backup through outages, say so at the survey and we will price a battery separately.

Usually as a society rather than as an individual flat. One flat rarely has its own roof rights or a separate connection to net-meter against. What does work is a common-area system owned by the association, offsetting lifts, pumps, corridor lighting and the water supply - often the association's largest bill. We are happy to present to your committee.

We do. Liaisoning, fees, charges and metering charges are all inside our scope. CEIG approval applies to industrial and high-tension installations, not to a normal home system, so a house has less paperwork to begin with. Either way you don't chase it - that is the point of a turnkey contract.

Panel performance warranties typically run 30 years, the panel product warranty 15 years, and inverters 10 years. The exact terms are set out in your project agreement, and we handle the claims process on your behalf under O&M.

Our O&M team takes over: cleaning schedule, remote monitoring, warranty claims and replacements. You get admin-panel access so you can check performance yourself, any day, without calling anyone.

Get in touch

Let's look at your roof.

Send us your location and your last electricity bill. We'll come out, survey the site, and give you a straight answer on whether solar makes financial sense for you - including if it doesn't.

Address
324 D, Kadampadi Road, Sulur,
Coimbatore - 641 401, Tamil Nadu

Request a free site visit

We'll call within one working day to arrange a visit.

WhatsApp
Free site visit No obligation. Report in 7 days.
Book it